Jan. 16, 2026
Yodoyabashi Station West District Urban Redevelopment Association
Daiwa House Industry Co., Ltd.
Sumitomo Corporation
Kanden Realty & Development Co., Ltd.
Office Tower Opens a New Gateway to Osaka's Midosuji Business DistrictYodoyabashi Gate Tower Completed
The Yodoyabashi Station West District Urban Redevelopment Association (Chairman: Koji Eguchi) and its participating members – Daiwa House Industry Co., Ltd. (Head Office: 3-3-5 Umeda, Kita-ku, Osaka; President: Hirotsugu Otomo), Sumitomo Corporation (Head Office: 2-3-2 Otemachi, Chiyoda-ku, Tokyo; Representative Director, President and Chief Executive Officer: Shingo Ueno) and Kanden Realty & Development Co., Ltd. (Head Office: 3-23 Nakanoshima, Kita-ku, Osaka; President: Emi Fukumoto) – have completed construction of Yodoyabashi Gate Tower, developed as part of the Yodoyabashi Station West District Type 1 Urban Redevelopment Project. The building was completed on December 15, 2025, and a completion ceremony was held on January 16, 2026.
Interior fit-out work for tenant spaces will continue, with office tenants scheduled to begin moving in from spring 2026 and the commercial floors expected to open in July 2026.
The project consolidates land and buildings through an urban redevelopment initiative to create a large-scale, office-centric mixed-use complex suited for one of Osaka's premier locations – a gateway to Midosuji and adjacent to the Nakanoshima district. Future development of Okawacho Park will also create an open waterfront space rich in greenery, contributing to the revitalization and sustainable growth of the Yodoyabashi area and the creation of a welcoming urban environment.
The project is also actively advancing energy-saving and low-carbon initiatives toward the realization of a decarbonized society. It is expected to obtain LEED Gold certification, an internationally recognized environmental performance rating.
Completion Photographs
Building Exterior (View from Yodoyabashi)
A new landmark emerging at the gateway to Midosuji, Osaka’s main boulevard. By emphasizing the podium, the design harmonizes with the Midosuji streetscape while creating a powerful and memorable appearance toward the intersection, expressing a strong sense of solidity.
Building Exterior (View from the Northwest)
Blessed with an open location open to the Nakanoshima area, a symbol of Osaka as a city of water. The design places strong emphasis on connections to the Tosabori River waterfront and surrounding greenery, with careful attention paid to the building’s presence and the beauty of its silhouette when viewed from afar.
Main Entrance
A distinctive entrance that leaves a strong impression on the intersection. The cylindrical form composed of mirrored mullions and glass sparkles like the surface of the Tosabori River, reflecting the surrounding cityscape during the day, and at night, transmitting the vibrancy of interior activity outward to animate the streetscape.
The tower was conceived as a new gateway at the entrance to Midosuji – a starting point for the evolution and globalization of Osaka’s world of business. The building’s form, with a strong sense of weight at the podium, and the lattice-window detailing on the façade express the distinctive presence of this "gateway."
The logo design reflects the building’s podium and upper-floor form, giving visual weight to the lower levels while maintaining a sharp, modern profile. The result is a highly recognizable symbol befitting a landmark office building.
Property Overview
| Building Name | : | Yodoyabashi Gate Tower |
| Project Developer | : | Yodoyabashi Station West District Urban Redevelopment Association |
| Participating Members | : | Daiwa House Industry Co., Ltd.; Sumitomo Corporation; Kanden Realty & Development Co., Ltd. |
| Location | : | 1-1 Kitahama 4-chome, Chuo-ku, Osaka |
| Access | : | Direct underground access to Yodoyabashi Station (Osaka Metro Midosuji Line / Keihan Main Line) |
| Site Area | : | 7,206 m2 |
| Total Floor Area | : | 132,424 m2 |
| Floors / Height | : | 29 above ground, 2 below ground / 135 m |
| Primary Uses | : | Offices, retail, parking |
| Urban Planning & Project Consultant | : | Nikken Sekkei Ltd. |
| Design & Supervision | : | Nikken Sekkei Ltd. |
| Construction | : | Obayashi Corporation |
Project Timeline
| November 2006 | Project study group established |
|---|---|
| August 2008 | Urban redevelopment preparatory association formed |
| August 2019 | Urban plan approved |
| July 2020 | Urban redevelopment association officially established |
| May 2021 | Rights conversion plan approved |
| October 2021 | Demolition work commenced |
| November 2022 | Construction of Yodoyabashi Gate Tower commenced |
| December 2025 | Construction completed |
| Spring 2026 | Office tenant move-in begins |
| July 2026 | Grand opening |
Inquiries
- Yodoyabashi Station West District Urban Redevelopment Association Secretariat
Tel :+81-6-6210-4701
E-mail :jimukyoku2020@dune.ocn.ne.jp
Related Topics : New Building in Yodoyabashi Station West District Type 1 Urban Redevelopment Project: "Yodoyabashi Gate Tower"


